clearstream BARD

Airconmech Ltd are pleased to announce they have completed Mechanical Services valued at €2.25M  for Clearstream BARD medical device manufacturers. 

The scope of work completed included the design and install of mechanical services to a new green field building containing 2 clean rooms and ancillary support areas. Services installed included:

  • LPHW Boilerhouse and Field pipework, Domestic Services,
  • High Pressure Nitrogen Compound and associated internal high pressure distribution lines,
  • Compressed air plant room and internal distribution pipework,
  • local air conditioning systems,  central fully conditioned clean room areas, 
  • Oxygen depletion systems to the cleanrooms with associated heating, ventilation, a/c systems to the ancillary spaces.
  • BMS systems were installed site wide for total control.