O Callaghan Mont Clare mechancial works

O’ Callaghan Mont Clare Hotel

Full mechanical services installation to front of house and bedroom area is now underway at the O’Callaghan Mont Clare Hotel in Dublin’s City Centre. The project includes works on 6 floors from the basement up, with the refurbishment of 80 bedrooms. In addition, AirconMech is delighted to complete mechanical installations to 26 new bedrooms in an extended area to […]

Copley St, Cork Student Accommodation

Copley St, Cork Student Accommodation – Second Phase

The second phase of Copley St, Cork Student Accommodation is well underway. We are delighted to be working again with John Paul Construction on this project. Mechanical Services Include: Full mechanical fit-out for the basement level to the third floor. Mains Water Hot Water, CWS, Soils & Waste Air Conditioning and Ventilation We are also working […]

Newbaze Infant Formula manufacturing Facility

Newbaze, Infant Formula Manufacturing Facility

We are delighted to work with Newbaze, a Chinese Food Production Company to revamp the former Bose plant at Carrickmacross, Co Monaghan. The 8,500sqm plant includes a 2,500sqm clean room facility. Mechanical Services Include the following: Supply of Air Handling Units Low and High-Pressure Ductwork Installation Air Conditioning Installation LPHW Pipework Installation CHW Pipework installation […]

Mechanical works Copley Lane Student Accommodation

Copley Lane Student Accommodation

Refurbishment works have commenced at Copley Lane, Student Accommodation. This is phase one in a two-phase project. Mechanical works in this phase include the installation of: Mains water pipework. Hot, cold and hot water return pipework Soils and waste pipework. AHU’s for residential, communal and Gym areas

Air Conditioning Vizor Sandyford

Vizor, The Atrium, Sandyford

The installation of a new air conditioning system, ventilation and other mechanical works are well underway for Vizor, the Financial Regulatory Software producers, at their offices in Sandyford. We are delighted to install: Air Conditioning Units Ventilation & associated ductwork & grilles Fire Extinguishers  

SPE Waters Technology Relocation Project

Waters Technology

SPE Relocation Project. This project consists of the development of a new production space within the Waters Facility and the relocation of an existing process to this new space. We are responsible for the installation and commissioning of all HVAC (and associated services) and compressed air services associated with the project. Works Include: Supply of air […]

Marlin Hotel, Bow Lane

Works are advancing apace at the new Marlin Hotel, Bow Lane. We are delighted to partner with McAleer & Rushe on this project, located at heartland of Dublin’s vibrant City Centre, only a 5-minute walk from St Stephen’s Green. The new wedge-shaped hotel has 301 bedrooms over 7 storeys with 2 basement levels. The development includes […]

Live Projects Danone Nutrition

Danone Nutrition Ireland

Provision of mechanical and ventilation services associated with the new packing hall and blending tower. Supply of air handling equipment Low pressure ductwork and stainless steel ductwork installations Cylon BMS controls installation Air conditioning and CHW pipework installations Soils & Waste pipework installation Project is being carried out wih the plant in full operation

Live Projects HIlton Gardens Hotel

Hilton Gardens Hotel Extension, Dublin 1

Mechanical services included: Extension and replacement of the existing plumbing, Soils & wastes installations Removal of the existing heating installation Installation of a new mechanical smoke ventilation system and dry risers.

Tommy Hilfiger Retail Outlet – Kildare Village

Mechanical Services Included: Ducted VRV System Heat recovery system All mains water pipework, hot water pipework and soils & waste pipework

Tullamore Medical Centre

Installation of a heat recovery ventilation system in the 3 storey health care facility Mechanical Services Included: Ductwork installation Fire dampers, volume control dampers and attenuators where required Insulation where required to reduce heat loss to untempered zones. Ventilation extract system