Deirdre Keogh at FCJ Bunclody Careers Night 91118

Careers Night FCJ Bunclody

Delighted to meet TY, fifth and sixth-year students at the recent careers night at FCJ Bunclody, secondary school. Our Graduateship programme for Mechanical and Building Services Engineers received a lot of interest particularly given the current climate where demand exceeds supply in this area. Other students were happy to learn about our Plumbing and Air Conditioning […]

Copley St, Cork Student Accommodation

Copley St, Cork Student Accommodation – Second Phase

The second phase of Copley St, Cork Student Accommodation is well underway. We are delighted to be working again with John Paul Construction on this project. Mechanical Services Include: Full mechanical fit-out for the basement level to the third floor. Mains Water Hot Water, CWS, Soils & Waste Air Conditioning and Ventilation We are also working […]

O Callaghan Collection

Well Done to the O’Callaghan Collection Fund Raiser

We are delighted to have contributed to this fantastic event raising much-needed funds for Charities doing incredible work around Ireland. A BIG WELL DONE to everyone involved at the O Callaghan Collection for making the cycle such a huge success.

Brickfield Lane Student Accommodation

Brickfield Lane Student Accommodation

AirconMech is the mechanical contractor on the Brickfield Lane Student Accommodation project, Cork St., Dublin 8. Working with Collen Construction, the project comprises of, 267 no.bedrooms and 37 no. cluster living spaces, complete with ground floor public spaces and Science and Tech spaces. Mechanical Services Include: Provision of centralised Energy Centre comprising of high-efficiency boiler plant, combined […]

Dominick Street Student Accommodation 5

Dominick Street Student Accommodation

Dominick Street Student Accommodation is AirconMech’s fourth venture into the ever-growing student accommodation sector, having completed the Montrose project for Ziggurat and currently on site for Hatch Street Student Ventures in Cork and Brickfield Student Accommodation, Dublin Mechanical works over the two buildings with 351 no.bedspaces include: The Installation of Low-Pressure Ductwork Air Conditioning LPHW Pipework […]

Phoenix House, Monaghan Road, Cork

Phoenix House, 4th floor Fit-out

The 4th-floor fit-out at Phoenix House, Monaghan Road, Cork, is our second fit-out for O Shea Leader. We previously fit-out the ground floor development for Regus. Mechanical works include: Installation of multiple Air Conditioning units Installation of multiple VAM units Installation of Ducting, Grilles and Louvres Commissioning and validation of all services  

Tommy Hilfiger kildare Village

Tommy Hilfiger, Kildare Village

It was great to provide mechanical works to a retail outlet with such a prestigious name as Tommy Hilfiger. Mechanical Services provided included: Installation of a ducted VRV system complete with heat recovery and all mains water pipework, hot water pipework and soils and waste pipework All heating and cooling were provided by a ducted VRV […]

Mountpark Logistics Baldonnell

Mountpark Logistics, Baldonnell

Mechanical works have commenced on the new extension to Mountpark Logistics Warehouse at Baldonnell. As well as providing mechanical solutions to the 11,054sqm warehouse, we are delighted to install and commission first and ground floor offices located at the front of the warehouse. Mechanical Services include: Supply of VRV Air Conditioning Mechanical Ventilation and Heat […]

Newbaze Infant Formula manufacturing Facility

Newbaze, Infant Formula Manufacturing Facility

We are delighted to work with Newbaze, a Chinese Food Production Company to revamp the former Bose plant at Carrickmacross, Co Monaghan. The 8,500sqm plant includes a 2,500sqm clean room facility. Mechanical Services Include the following: Supply of Air Handling Units Low and High-Pressure Ductwork Installation Air Conditioning Installation LPHW Pipework Installation CHW Pipework installation […]

Mechanical works Copley Lane Student Accommodation

Copley Lane Student Accommodation

Refurbishment works have commenced at Copley Lane, Student Accommodation. This is phase one in a two-phase project. Mechanical works in this phase include the installation of: Mains water pipework. Hot, cold and hot water return pipework Soils and waste pipework. AHU’s for residential, communal and Gym areas

FIRAS Certification Scheme

FIRAS Certification Awarded to AirconMech

We are delighted to announce that AirconMech has been awarded FIRAS certification for Fire Rated Ductwork. Following a comprehensive review of our internal processes, an on-site inspection and a written exam completed by AirconMech Supervisors and Technicians, we passed with flying colours! The FIRAS certification Scheme was awarded by Warrington Certification, a provider of mandatory and […]

CIBSE 5 aside Soccer Blitz

CIBSE 5 A-side Soccer Blitz

A BIG well done to the AirconMech “Dream” team. They did us proud, reaching the final with a narrow 3-2 defeat in the CIBSE 5 aside soccer blitz. Congratulations to Tech Refrigeration who were the overall winners and to Versatile for sponsoring the event on Thursday, 31st May.