Phoenix House, Monaghan Road, Cork

Phoenix House, 4th floor Fit-out

The 4th-floor fit-out at Phoenix House, Monaghan Road, Cork, is our second fit-out for O Shea Leader. We previously fit-out the ground floor development for Regus. Mechanical works include: Installation of multiple Air Conditioning units Installation of multiple VAM units Installation of Ducting, Grilles and Louvres Commissioning and validation of all services  

Tommy Hilfiger kildare Village

Tommy Hilfiger, Kildare Village

It was great to provide mechanical works to a retail outlet with such a prestigious name as Tommy Hilfiger. Mechanical Services provided included: Installation of a ducted VRV system complete with heat recovery and all mains water pipework, hot water pipework and soils and waste pipework All heating and cooling were provided by a ducted VRV […]

Mountpark Logistics Baldonnell

Mountpark Logistics, Baldonnell

Mechanical works have commenced on the new extension to Mountpark Logistics Warehouse at Baldonnell. As well as providing mechanical solutions to the 11,054sqm warehouse, we are delighted to design, install and commission first and ground floor offices located at the front of the warehouse. Mechanical Services include: Supply of VRV Air Conditioning Mechanical Ventilation and […]

Newbaze Infant Formula manufacturing Facility

Newbaze, Infant Formula Manufacturing Facility

We are delighted to work with Newbaze, a Chinese Food Production Company to revamp the former Bose plant at Carrickmacross, Co Monaghan. The 8,500sqm plant includes a 2,500sqm clean room facility. Mechanical Services Include the following: Supply of Air Handling Units Low and High-Pressure Ductwork Installation Air Conditioning Installation LPHW Pipework Installation CHW Pipework installation […]

Mechanical works Copley Lane Student Accommodation

Copley Lane Student Accommodation

Refurbishment works have commenced at Copley Lane, Student Accommodation. This is phase one in a two-phase project. Mechanical works in this phase include the installation of: Mains water pipework. Hot, cold and hot water return pipework Soils and waste pipework. AHU’s for residential, communal and Gym areas

FIRAS Certification Scheme

FIRAS Certification Awarded to AirconMech

We are delighted to announce that AirconMech has been awarded FIRAS certification for Fire Rated Ductwork. Following a comprehensive review of our internal processes, an on-site inspection and a written exam completed by AirconMech Supervisors and Technicians, we passed with flying colours! The FIRAS certification Scheme was awarded by Warrington Certification, a provider of mandatory and […]

CIBSE 5 aside Soccer Blitz

CIBSE 5 A-side Soccer Blitz

A BIG well done to the AirconMech “Dream” team. They did us proud, reaching the final with a narrow 3-2 defeat in the CIBSE 5 aside soccer blitz. Congratulations to Tech Refrigeration who were the overall winners and to Versatile for sponsoring the event on Thursday, 31st May.    

Air Conditioning Vizor Sandyford

Vizor, The Atrium, Sandyford

The installation of a new air conditioning system, ventilation and other mechanical works are well underway for Vizor, the Financial Regulatory Software producers, at their offices in Sandyford. We are delighted to install: Air Conditioning Units Ventilation & associated ductwork & grilles Fire Extinguishers  

SPE Waters Technology Relocation Project

Waters Technology

SPE Relocation Project. This project consists of the development of a new production space within the Waters Facility and the relocation of an existing process to this new space. We are responsible for the design, installation and commissioning of all HVAC (and associated services) and compressed air services associated with the project. Works Include: Supply of […]

Mechanical installation for Bow Lane Hotel

Bow Lane Hotel

Mechanical installations for new 301 bedroom hotel with 7 storeys over 2 basement levels located in Dublin City Centre. The hotel includes a pub, restaurant and new gymnasium. Works include: Supply air handling equipment. Boiler Room CHW pipework. Water services pipework. Fire Rated Ductwork BMS

Live Projects Danone Nutrition

Danone Nutrition Ireland

Provision of mechanical and ventilation services associated with the new packing hall and blending tower. Supply of air handling equipment Low pressure ductwork and stainless steel ductwork installations Cylon BMS controls installation Air conditioning and CHW pipework installations Soils & Waste pipework installation Project is being carried out wih the plant in full operation

Live Projects HIlton Gardens Hotel

Hilton Gardens Hotel Extension, Dublin 1

Mechanical services included: Extension and replacement of the existing plumbing, Soils & wastes installations Removal of the existing heating installation Installation of a new mechanical smoke ventilation system and dry risers.