Services installed: Full 3 pipe VRV Sanyo Air Conditioning System complete with Heat Recovery, Supply and Extract Ventilation units,Mains Water, Soils and Wastes, compressed air and a BMS System.

Project Value: £45,000,000.

Project Scope:The system installed extracts stale air and replaces it with fresh air, while at the same time retaining up to 80 percent of the heat capacity of the air, thus ensuring optimum energy efficiency of the ventilation system. A BMS System is installed in the building which consists of 2 local panels in each floor.