Starwood, with CBRE as Project Managers, have just completed the full retrofit of the 7,800sqm Block D building of their Iveagh Court Campus.

Included was the complete overhaul of the existing HVAC systems and the implementation of a new Building Energy Management System to provide enhanced control to the end user.

Modular building and off-site prefabrication processes were utilised by AirconMech and MAC Group to ensure that the project was completed within the short time frame allowed.

 

Pictured: Chilled water header and associated secondary pipework arrangements pre-fabricated and ready for site installation at Iveagh Court project. This methodology will reduce Hot Works requirements on site, ensuring a safer and more efficient installation whilst minimising the system downtime within a live environment. Also pictured is a selection of photos showing the finished mechanical works.

Mechanical and ventilation services included:

  • Strip out of existing services
  • Pumps and calorifiers
  • New hot boosted cold and hot water return pipework
  • New CHW/LPHW pipework to 4- pipe fan coil units
  • Installation of air handling units and chillers
  • All associated ductwork, dampers, attenuators and ancillaries.
  • Complete pressure testing, balancing and commissioning of ventilation and pipe systems.
  • Works completed in a live environment
  • Full BMS installed

 

.