Mallinckrodt Pharmaceuticals, Blanchardstown, Dublin 15

1,700sqm office HVAC installation over 3 floors

  • Low Pressure Ductwork Installation
  • Air Conditioning Installation
  • Soils & Waste Pipework Installation