We are delighted to have completed the mechanical installation for the new 3 storey, €60m Primary Care Centre in Tullamore, Co Offaly.

Contracted to complete the Mechanical Services our works included:

  • Installation of a heat recovery ventilation system
  • Installation of a network of ductwork to supply heat recovery ventilation throughout the healthcare facility
  • The ventilation systems comes complete with fire dampers, volume control dampers and attenuators where required
  • The system was fully insulated where needed, to reduce heat loss to untempered zones.
  • Installation of a ventilation extract system in the toilet areas.