TASC 5 Floor Office Block at Dublin Airport
Full mechancial installation completed for approx 4,645 sqm office block.,
Works included:
- Heating and cooling 5 floors with VRF system.
- Each floor was open plan with meeting rooms treated separately.
- Main LPHW from a central boiler house with direct gas fired boilers feeding radiators at each level.
- AHU plant with ducting and associated works to temper the supply to the VRF system.
- Central gas fired storage Calorifier feeding the central core toilet blocks.
- The building is controlled by a central BMS with individual AC controllers as needed.