Copley St, Cork Student Accommodation

Copley St, Cork Student Accommodation – Second Phase

The second phase of Copley St, Cork Student Accommodation is well underway. We are delighted to be working again with John Paul Construction on this project. Mechanical Services Include: Full mechanical fit-out for the basement level to the third floor. Mains Water Hot Water, CWS, Soils & Waste Air Conditioning and Ventilation We are also working […]

Brickfield Lane Student Accommodation

Brickfield Lane Student Accommodation

AirconMech is the mechanical contractor on the Brickfield Lane Student Accommodation project, Cork St., Dublin 8. Working with Collen Construction, the project comprises of, 267 no.bedrooms and 37 no. cluster living spaces, complete with ground floor public spaces and Science and Tech spaces. Mechanical Services Include: Provision of centralised Energy Centre comprising of high-efficiency boiler plant, combined […]

Dominick Street Student Accommodation 5

Dominick Street Student Accommodation

Dominick Street Student Accommodation is AirconMech’s fourth venture into the ever-growing student accommodation sector, having completed the Montrose project for Ziggurat and currently on site for Hatch Street Student Ventures in Cork and Brickfield Student Accommodation, Dublin Mechanical works over the two buildings with 351 no.bedspaces include: The Installation of Low-Pressure Ductwork Air Conditioning LPHW Pipework […]

Phoenix House, Monaghan Road, Cork

Phoenix House, 4th floor Fit-out

The 4th-floor fit-out at Phoenix House, Monaghan Road, Cork, is our second fit-out for O Shea Leader. We previously fit-out the ground floor development for Regus. Mechanical works include: Installation of multiple Air Conditioning units Installation of multiple VAM units Installation of Ducting, Grilles and Louvres Commissioning and validation of all services  

Newbaze Infant Formula manufacturing Facility

Newbaze, Infant Formula Manufacturing Facility

We are delighted to work with Newbaze, a Chinese Food Production Company to revamp the former Bose plant at Carrickmacross, Co Monaghan. The 8,500sqm plant includes a 2,500sqm clean room facility. Mechanical Services Include the following: Supply of Air Handling Units Low and High-Pressure Ductwork Installation Air Conditioning Installation LPHW Pipework Installation CHW Pipework installation […]

SPE Waters Technology Relocation Project

Waters Technology

SPE Relocation Project. This project consists of the development of a new production space within the Waters Facility and the relocation of an existing process to this new space. We are responsible for the design, installation and commissioning of all HVAC (and associated services) and compressed air services associated with the project. Works Include: Supply of […]

Mechanical installation for Bow Lane Hotel

Bow Lane Hotel

Mechanical installations for new 301 bedroom hotel with 7 storeys over 2 basement levels located in Dublin City Centre. The hotel includes a pub, restaurant and new gymnasium. Works include: Supply air handling equipment. Boiler Room CHW pipework. Water services pipework. Fire Rated Ductwork BMS

Mechancial Installations at Notre Dame Residential Development

Notre Dame Residential Development, Dublin 14

Residential development consists of 7 apartment blocks with 260 apartments. Mechanical Services Included: Supply of Heat Recovery Unit Low Pressure as well as Fire Rated Ductwork Installation Dry Riser Installation Fire Extinguisher Installation